Water Politics.... Crazy stuff

Recommended Posts

Auckland have been wanting to have approval to take an extra 200 million litres of water per day(200,000 cubic meters).  The claim was lodged back in 2013!).

The mean flow rate of the Waikato River is 340 m3/per sec

So that is about 10 minutes of water flow per day, before it becomes salt water.

A dry spring will exacerbate Auckland's potential water crisis

Share this post


Link to post
Share on other sites

Anyone know the Technical side of this? Would the water have to go through a pumping station?

Where would it be located and what if any would the consequences be for downstream Waikato?

Share this post


Link to post
Share on other sites

WAIKATO PIPELINE AND PUMP STATION

Achieving a more reliable water supply for Auckland

 

Ensuring that water flows reliably from our taps whenever we need it, despite the growth in population around us, is essential to modern life. It’s what CH2M Beca delivered through Project Waikato.

Auckland is expanding, rapidly. Essential infrastructure needs to keep pace with this growth, including the water supply network. That’s why Watercare devised the $100 million Project Waikato. It involves the design and construction of a new water supply for Auckland from the Waikato River, increasing the supply reliability of the network and providing for the longer-term population growth predicted in the Auckland region.

To deliver 150 million litres of treated water per day from the Waikato River to a reservoir in Manukau, the extensive work undertaken included a 2,000 litres per second river intake structure, a raw water pump station, advanced treatment plant and a 37km-long steel pipeline.

We provided multi-disciplinary design services for all elements of the project and also undertook construction support, commissioning and operation during testing for two years before completion to ensure everything was functioning effectively. To allow the potentially disruptive pipeline construction, our community liaison and environmental management staff did a great job meeting the tough demands of the regulating authorities.

An innovative design approach meant significant cost savings for Watercare. By undertaking complex analysis to model pipe and soil interactions over different conditions, we designed tailored construction techniques. These enabled the wall thickness to be reduced from the standard 9.5mm to 8mm over most of its length – representing huge savings.

  • Thanks 1

Share this post


Link to post
Share on other sites

It doesn't say where the pump station is, but it would have to be somewhere close to the mouth?

  • Thanks 1

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×
×
  • Create New...